Customization: | Available |
---|---|
Door: | Single Door |
Installation: | Free-Standing |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Refrigerant: R600a
Control means: Electronic control/mechanical control
Unit dimension: R445x800mm
Loading capacity: 250pcs/40HQ
SPECIFICATION
MODEL |
MC-88 |
POWER SUPPLY |
115V - 60Hz |
RATED CURRENT |
1.7A |
TEMPERATURE |
39 - 59 Degrees F |
STANDBY COOLING TIME |
5-10 HOURS |
DIMENSIONS |
20" ROUND / 32.5" TALL |
WEIGHT |
59.5 LBS. |
INSTALLATION
It is advisable to clean the inside of the Party Fridge with lukewarm water using a mild detergent, and then to dry it thoroughly prior to use.
The temperature in the fridge will depend on:
* The temperature in the surrounding area
* The frequency and duration when the lid is open.
* Contains in the fridge
Therefore length of the time may vary for the unit to reach the desired temperature set by a user.
The refrigeration system of the cabinet is designed to operate with the cabinet located on a flat surface. Avoid tilting the cabinet side.
If the cabinet must be tilted on an angle for handling or moving purposes, allow it to sit in an upright position 20 to 30 minutes prior to plugging it in and starting the cooling of the storage compartment.
Care & Cleaning
1) Remove the contents of the appliance
2) Wipe the inside and outside with surfaces with a damp cloth. The addition of vinegar to the water is good for the prevention of mold and fungus.
3) Take the lid apart as shown on the drawing and clean it.
4) Clean the detachable bottom and the lid parts with lukewarm water and detergent.
5) Wipe all parts thoroughly after the cleaning.